Portfolio

Home/Portfolio/

Heavy Load Carrier

2019-06-11T10:28:11+07:00

BLUE MARLIN SHIP SEA - FASTENING REMOVAL Supplying manpower, tools, equipment and consumables to remove sea-fastening structures  for the rig detailed as follow: To Remove and grind after cutting work 46 pcs of  sea-fastenings (item 01-46) on DW: No.1115874-003-01. To Remove and grind after cutting work 19 pcs strong boxes  (item 47-48) on DW No.1115874-003-01. [...]

AHTS

2015-11-23T13:54:56+07:00

TOURMALINE Vessel AIR CONDITIONAL SYSTEM REPAIR ON COMPRESSOR NO.2 - Take out the pipe, cut of the leaking elbow. - Renew elbow and install bracket for safety. - Install back the pipe. - Vacuum the system on compressor and condenser No2. - Charging Freon gas into the system, - Start-up compressor no.2. - Tested accordingly.

PSV

2015-11-23T08:53:43+07:00

POSH SHEARWATER ESCAPE HATCH COVER MODIFY + Supply Spring of emergency escape hatch as per origin sample onboard. - Modify the hatch cover with scope of works as below: - Remove the hinges and the lock by cutting - Re-position the hinges and lock. -Install counter weight for escape hatch cover. Rewinding Motor.     [...]

Towing Tugs

2019-06-11T10:28:11+07:00

WESTSEA TITAN REFRIGERATION SYSTEM REPAIR Compressor No.1 - Release refrigeration gas out of systems - Overhaul exist freezer compressor by chemical liquid. - Fill up the oil - Renew oil separator by oxygen and acetylene - Install compressor into origin position - Renew suction valve, discharge valve by oxygen and acetylene - Testing all condenser [...]