-Lift up the flowmeter from Engine room to main deck.
– Arrange transportation to workshop for inspiron.
– Cleaning, disassemble the unit for checking,
– Re-assemble back after repair, ready for calibration.
– Send it back to vessel via PTSC Offshore services.